Providence College Campus Project Updates

6/9/2017 - Huxley Transformation Phase B

The granite veneer has begun to be installed along the radial walls at the Huxley/Eaton intersection.  Seat wall foundations have been poured around Glay Field.  This will be a great place to sit and watch the Friars.

HuxleyTransP2wallimage1.jpghuxleyseatwallP2image5.jpg

Looking north between Guzman and Glay Field the old Huxley Ave is no longer recognizable.  The old Guzman hill is no longer. Looking forward to an improved walk up hill come September​​​​.

HuxleytransP2northroad3.jpghuxleytransP2guzmanhillimage4.jpg

​​​​​​​​​​​​6/8/2017 Lennon Family Artificial Turf Field

​​The Lennon Field is getting a much needed resurfacing.  A new e-layer, which provides cushioning , is being placed now​ before the new turf can be put down.

Lennonresurface.jpg

5/11/2017 - Huxley Transformation Phase B

​The bank from the new stone wall east toward Glay Field and the Parking lot is almost ready for landscaping. Both of the pedestrian gate side walls have been poured, along with the center wall.  They will be finished with a granite veneer.

transformationglaywall.jpgtransformationnewwall.jpg
 5/11/2017 - New Red Oak planted on the Smith Squad​​


5/8/2017 - ​​​​PC celebrates the formal dedication of the Arthur & Patricia Ryan Center for Business Studies.

​​dedicationryanbell.jpg

Arthur F. Ryan ’63 & ’90Hon. laughs with his classmate, Kevin J. Phelan ’66 & ’15Hon., as he rings a bell to symbolize the opening of the business school building. 

5/3/2017 - Huxley Transformation

Construction continues on the new stone wall along the softball field. They are nearing the end of this long serpentine wall. A little further down they are working to connect drainage pipes to the existing catch basin. The stairs from Glay Parking have also been graded. Soon this whole bank will be ready for landscaping!

huxleyphasebbfieldwall.jpghuxleytransphasebbfieldwall2.jpg

4/28/2017 - Chapey Field at Anderson Stadium

The covered pavilion is coming along nicely​.  The electrical conduit is currently being installed for all lights, cameras, and speakers. The grade is being set for the next concrete pour.

Pavillionchapeyfield2060.jpg

Pavillionchapeyfield2061.jpg
 

​2/27/2017 - Huxley Transformation Video Update


 

​ ​​