 Architect

​The S/L/A/M Collaborative

Project Overview:

Using a phased in approach, construction of 35,000 square feet of new space including classroom, office and lab space and the renovation of approximately 80,00 square feet of existing space. 

Albertus Hall Renovation and Expansion

10/24/2016 - ​Picture 1- Mechanical room roof is being prepped.  Once the room is water tight, mechanical equipment can be moved in.  Picture 2 - South foundation wall of addition.  The cut outs in the wall indicate lower level windows.

Science Complex under construction​​​Science Complex under construction​​​

9/27/2016 - South wall of new addition is being formed. New conduit for new mechanical room is being prepared for concrete to be poured.​


sciencenewwall1499.jpg

scienceconduit.jpg



​​​

8/23/2016 - Soil nailing on the Science Complex site stabilizes the steep soil slopes and allows for maximized site square footage.

AlbertussoilIMG1112.jpg

​​​​8/5/2016 - Racks for temporary utility lines have been installed on south wall of Albertus.   New mechanical room construction scheduled for the Fall.

almagsouthracks934.jpg

7/22/2016  Albertus Hall Renovation and Expansion

A great-uncle’s gift provides $1 million to help renovate and expand PC Science Complex. Read more about the Science Complex renovation...

An exciting first look at the new science compex

​​7/6/2016 - Work on preparing site for construction of new mechanical room has begun.  Workers on south wall are installing racks that will hold temporary utility conduit running to the existing mechanical room until the new mechanical room is built.

 Albertus-Phase-I-site-pictureweb.jpgAlbertus-Phase-1-southwallwebjpg.jpg